This job was a new campground facility bathroom that had an epoxy floor installed one year prior (not by Strong Bond) that failed. The coating had to be completely removed from floor and cove base, extensive prep required on floors and wall base before installing our Hybri-Flex EQ System and 4″ integral cove base.